|
| color = | logo = ChinaRailwayHighspeed.svg | logo_width = 180px | logo_alt = | image = | image_width = | image_alt = | caption = | type = | system = | status = Operational | locale = Nanning Guangzhou | start = Nanning | end = Guangzhou South | stations = 23 | routes = 1 | ridership = | ridership2 = | open = December 26th 2014 | close = | owner = | operator = China Railway High-speed | character = | depot = | stock = | linelength = | tracklength = | notrack = | gauge = | old gauge = | lgauge = | minradius = 3,500m | maxincline = Nanning-Guigang 12% Guigang-Guangzhou 6% | racksystem = | route number= | el = | speed = | elevation = | website = | map = | map_state = }} Nanning–Guangzhou High-Speed Railway , also known as the Southern Guangzhou High-Speed Railway or the South Canton High-Speed Railway, connects Nanning, capital of Guangxi Zhuang Autonomous Region, and Guangzhou, capital of Guangdong Province, in China. Construction started on November 9, 2008; Nanning to Wuzhou was completed by April 18, 2014, while the full full route opened on December 26, 2014. The total cost was about 41 billion RMB.〔(【引用サイトリンク】script-title=zh:南宁至广州铁路今日开工 投资总额410亿元 )〕 The railway is expected to spur economic development, and increase mobility across the Guangxi and western Guangdong regions. ==Route== The railway travels mostly along the Pearl River Delta's Xi River valley. From Nanning it initially follows the route of the Liuzhou–Nanning Intercity Railway to Litang in Binyang County. It then heads eastward through Guigang, crossing the Yu River, over Guiping, Pingnan and Tengxian to Wuzhou. After entering Guangdong it passes Yunan and Yunfu to Zhaoqing, before reaching Guangzhou South Railway Station. Its total length is , of which is in Guangxi, in Guangdong. Twenty-three stations will be built along the route, though not all will service passengers. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Nanning–Guangzhou High-Speed Railway」の詳細全文を読む スポンサード リンク
|